The designers and structural engineers of the IMC are highly competent, flexible, motivated and deliver their assigned work on time and with demonstrable quality.

Wolfgang H., Director of Construction - Global Player in Conveyor Technology

Filter system Saal Germany (DE)

Set up of a filter system in an existing reinforced concrete structure. The fitting process was extremely complicated since it had to take place in full operating mode, no inventory documents were available and the fitting had to take place in an 80-year old reinforced concrete structure, under which multi-track railway operations were running. 

Project data
City: Saal a.d. Donau Germany (DE)
 
Implementation: 2006
 
Services: General Contractor
General Planner
 

Continue to:
previous project
next project
Project map
Project list

More projects

Open pit equipment for open pit copper mining in Chile (CL)

Implementation: 2016
Services: Shop Drawings
Structural Design / Static

[Show project]

Swivel scraper

Implementation: 2006
Services: Structural Design / Static

[Show project]

Transfer towers Russia (RU)

Implementation: 2010
Services: Shop Drawings
Structural Design / Static

[Show project]

 

News

18.10.2023We've moved!

In mid-October, we moved into our new office space in Leipzig-Zentrum-Süd. You can now reach us at Münzgasse 28, 04107 Leipzig. All other contact...[more]


30.06.2023Group dynamics on the treadmill - Leipzig Company Run 2023

This year, the IMC once again presented its moving group dynamics at the Leipzig Company Run on 28 June. Our team, consisting of experienced runners...[more]


26.06.2022Leipzig's Company Run - IMC remains sporty

On 22.06.22 more than 12,000 people from all over Leipzig and the surrounding area came together for the SchnelleStelle.de Company Run Leipzig - and...[more]